top of page

SOLAR FOR HOMES

Join the thousands of Australians switching to solar!

Are you looking for a new solar system?

At Regenerate Electrical we offer a solution to your
Solar energy needs. 

We pride ourselves on providing customised solutions to our customers.

Your home power station is not a cookie cutter one size, one make, fits all. Every system needs to be tailored to suit each individual customer's needs. 

 Our team at Regenerate Electrical has extensive experience working within the electrical industry throughout Melbourne and understand how important safety is when installing power generation equipment into your home or business premises .

 

This ensures that every job will be done correctly and safely without compromising quality workmanship . You can rest easy knowing that you are getting an expertly installed product by professionals who know what they're doing!

 

​

OUR RESIDENTIAL SOLAR PANEL FEATURES

High power Mono Perc

  • Up to 380W front power and 20.7% module efficiency with half-cut and MBB (Multi Busbar) technology bringing more BOS savings

  • Lower resistance of half-cut and good reflection effect of MBB ensure high power

​

High Reliability

  • Ensured PID resistance through cell process and module material control

  • Resistant to salt, acid and ammonia

  • Mechanical performance: Up to 5400 Pa positive load and 2400 Pa negative load

High Energy Generation

  • Excellent IAM and low light performance validated by 3rd party with cell process and module material optimization

  • Better anti-shading performance and lower operating temperature

15-25 year warranty

Comprehensive Products and System Certificates

  • IEC61215/IEC61730/IEC61701/IEC62716

  • ISO 9001: Quality Management System

  • ISO 14001: Environmental Management System

  • ISO14064: Greenhouse Gases Emissions Verification

  • ISO45001: Occupational Health and Safety Management System

120 Cell
MONOCRYSTALLINE MODULE
370-500W
POWER OUTPUT RANGE
20.7%
MAXIMUM EFFICIENCY
0~+5W
BINNING TOLERANCE

GOVERNMENT REBATES

And because we love helping people save money ....

We are a registered 'Clean Energy Council' retailer, meaning we are eligible to claim both the federal rebates along with the specific state wide rebates currently on offer.

 

We are committed to ensuring the start to finish process is simple and easy for both residential home owners and business owners alike. 

solar government rebates

INSTALLING YOUR SOLAR OUR PROCESS

THE FINANCIALS

Your experienced Project Coordinator will contact you to finalise deposit and repayment details. If applicable, debit payments will commence within 7 days of signed acceptance.

Specific information about your site location, roof structure and proposed solar panel layout will be gathered for the structural report. The structural report will specify how and where the solar panels should be installed to meet Australian Installation Standards

STRUCTURAL SIGN OFF
INSTALLATION

Our highly trained, Clean Energy Council Accredited Installation team will commence install of your system within 3 weeks of approval.

Following the successful installation, we will arrange for a Certificate of Electrical Safety to be issued.

FEED IN TARIFF APPLICATION

Now that the installation has been completed, an application to your electricity retailer will be made in order to have the Feed in Tariff applied to your energy bill. Regenerate Electrical will provide all the required paperwork to the retailer on your behalf. We recommend that you contact your retailer 2 weeks after lodgment to ensure the application is being processed in a timely manner. It can take up to 8 weeks or more for the Feed in Tariff to appear on your bill.

ELECTRICAL DESIGNS

Your system's final electrical design will involve:

  • number and type of panels to be installed,

  • number and type of inverters to be installed,

  • specification of AC and DC isolators,

  • cable length and sizing,

  • specification of solar sub board and network protection system as required

  • as well as the final connection to MSB

DISTRIBUTOR APPROVAL PROCESS

Your professionally designed system will receive regulator and distributor pre approval.
Approval from your DNSP provider may take up to 65 business days depending on the size and complexity.

HANDOVER AND POWER UP!

On receipt of final payment, we will arrange for a formal handover to take place. This includes training on how to operate your system as well as a comprehensive manual containing all the necessary supporting documentation under the CEC Approved Solar Retailer Program. We also provide your electrical retailer the paperwork allowing you to power up your new system!

electrician oakleigh solar installation south east melbourne.jpg

REQUEST A SOLAR QUOTE

bottom of page